6704
|
Reaffirmation for API RP 2MIM, 1st Edition – Mooring Integrity Management
|
SC02/VG: Voting Group; SC02/RG05: Asset Integrity Management;
|
04-17-2025
|
05-15-2025
|
Grayson Ridgway
|
|
6703
|
Reaffirmation for API RP 2A-WSD, 22nd Edition – Planning, Designing and Constructing Fixed Offshore Platforms--Working Stress Design
|
SC02/VG: Voting Group; SC02/RG20: Fixed Steel Structures;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6702
|
Reaffirmation for API Spec 2B, 6th Edition (w Addendum) – Fabrication of Structural Steel Pipe
|
SC02/RG08: Materials & Fabrication; SC02/VG: Voting Group;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6701
|
Reaffirmation for API RP 2EQ, 1st Edition (w Addendum) - Seismic Design Procedures and Criteria for Offshore Structures
|
SC02/VG: Voting Group; SC02/RG13: Seismic Design Procedures & Criteria;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6700
|
Reaffirmation for API Spec 2F, 6th Edition (w Addendum) – Mooring Chain
|
SC02/VG: Voting Group; SC02/RG02: Stationkeeping Design & Analysis;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6699
|
Reaffirmation for API 2FB, 1st Edition – Design of Offshore Facilities Against Fire and Blast Loading
|
SC02/RG09: Topsides Structure; SC02/VG: Voting Group;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6698
|
Reaffirmation for API RP 2FPS, 2nd Edition - Planning, Designing, and Constructing Floating Production Systems.
|
SC02/VG: Voting Group; SC02/RG16: Floating Production Structures;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6697
|
Reaffirmation for API Spec 2H, 9th Edition (w Addendum) - Carbon Manganese Steel Plate for Offshore Platform Tubular Joints
|
SC02/RG08: Materials & Fabrication; SC02/VG: Voting Group;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6696
|
Reaffirmation for API 2I, 3rd Edition - In-Service Inspection of Mooring Hardware for Floating Drilling Units
|
SC02/VG: Voting Group; SC02/RG02: Stationkeeping Design & Analysis;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6695
|
Reaffirmation for API RP 2SC, 1st Edition (w Addendum) – Manufacture of Structural Steel Castings for Primary Offshore Applications.
|
SC02/RG08: Materials & Fabrication; SC02/VG: Voting Group;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6694
|
Reaffirmation for API Spec 2SF, 1st Edition (w Addendum) – Manufacture of Structural Steel Forgings for Primary Offshore Applications.
|
SC02/RG08: Materials & Fabrication; SC02/VG: Voting Group;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6693
|
Reaffirmation for API RP 2SIM, 1st Edition – Structural Integrity Management of Fixed Offshore Structures
|
SC02/VG: Voting Group; SC02/RG05: Asset Integrity Management;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6692
|
Reaffirmation for API RP 2SM, 2nd Edition – Design, Manufacture, Installation, and Maintenance of Synthetic Fiber Ropes for Offshore Mooring
|
SC02/VG: Voting Group; SC02/RG02: Stationkeeping Design & Analysis;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6691
|
Reaffirmation for API RP 2X-A1, 4th Edition – Ultrasonic and Magnetic Examination of Offshore Structural Fabrication and Guidelines for Qualification of Technicians
|
SC02/RG08: Materials & Fabrication; SC02/VG: Voting Group;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6690
|
Reaffirmation for API Spec 2Y-A1, 5th Edition – Specification for Steel Plates, Quenched-and-Tempered, for Offshore Structures
|
SC02/RG08: Materials & Fabrication; SC02/VG: Voting Group;
|
04-16-2025
|
05-14-2025
|
Grayson Ridgway
|
|
6689
|
Ballot For API 17J 5th Edition Addendum 1
|
SC17: Voting Flexible Pipe and Ancillary Equipment
|
04-15-2025
|
05-20-2025
|
Jose Godoy
|
Open Document
|
6688
|
Reaffirmation for API RP 2SM, 2nd Edition – Design, Manufacture, Installation, and Maintenance of Synthetic Fiber Ropes for Offshore Mooring
|
SC02/VG: Voting Group; SC02/RG02: Stationkeeping Design & Analysis;
|
04-10-2025
|
05-08-2025
|
Grayson Ridgway
|
|
6687
|
Reaffirmation for API RP 2Z, 4th Edition - Preproduction Qualification for Steel Plates for Offshore Structures
|
SC02/RG08: Materials & Fabrication; SC02/VG: Voting Group;
|
04-10-2025
|
05-08-2025
|
Grayson Ridgway
|
|
6686
|
Reaffirmation for API RP 95J, 1st Edition – Gulf of Mexico Jackup Operations for Hurricane Season
|
SC02/VG: Voting Group; SC02/RG14: Jack-Up MODU's;
|
04-10-2025
|
05-08-2025
|
Grayson Ridgway
|
|
6685
|
Reaffirmation for API RP 2TOP, 1st Edition – Topside Structure
|
SC02/RG09: Topsides Structure; SC02/VG: Voting Group;
|
04-10-2025
|
05-08-2025
|
Grayson Ridgway
|
|
6684
|
Feedback Requested - API 588, 2nd Edition
|
SCIMI Subcommittee
|
04-08-2025
|
04-29-2025
|
Katie Burkle
|
Open Document
|
6683
|
API MPMS Chapter 3.1B Standard Practice for Level Measurement of Liquid Hydrocarbons in Stationary Tanks by Automatic Tank Gauging, Fifth Edition
|
COLM: Committee on Liquid Measurement
|
04-07-2025
|
05-23-2025
|
Nicholas Monchak
|
Open Document
|
6682
|
API 521, 8th Edition - Work Item 17 - Annex E - 2nd Reballot
|
SCPRS - Subcommittee on Pressure-Relieving Systems
|
04-03-2025
|
05-02-2025
|
Katie Burkle
|
Open Document
|
6681
|
API 520, Pt1, 11th Edition - Improvements to Table 1 and Table 2-Reballot
|
SCPRS - Subcommittee on Pressure-Relieving Systems
|
04-03-2025
|
05-15-2025
|
Katie Burkle
|
Open Document
|
6680
|
API 520, Pt1, 11th Edition - Minimum Operating Pressure for POPRVs
|
SCPRS - Subcommittee on Pressure-Relieving Systems
|
04-03-2025
|
05-02-2025
|
Katie Burkle
|
Open Document
|
6679
|
API 19V Subsurface Completion Isolation (Barrier) Valves and Related Equipment - Comments Only
|
SC19: 19V Subsurface Completion Isolation (Barrier) Valves and Related Equipment
|
04-01-2025
|
04-30-2025
|
Elton Patram
|
|
6678
|
API MPMS Chapter 5.1 General Considerations for Measurement by Meters, Fifth Edition
|
COLM: Committee on Liquid Measurement
|
03-28-2025
|
05-09-2025
|
Nicholas Monchak
|
Open Document
|
6677
|
API 682, 5th Edition
|
SOME - Subcommittee on Mechanical Equipment
|
03-28-2025
|
05-02-2025
|
Katie Burkle
|
Open Document
|
6676
|
API 585, 3rd Edition - COMMENT ONLY
|
SCIMI Subcommittee
|
03-27-2025
|
04-30-2025
|
Katie Burkle
|
Open Document
|
6675
|
TG OCTG - WI 2404 – 5CT Requirements for Accessory Material
|
SC05/TG1: Task Group on OCTG Casing & Tubing
|
03-27-2025
|
05-08-2025
|
Mario Diaz
|
Open Document
|
6674
|
API 576, 5th Edition, Addendum 1
|
SCIMI Subcommittee
|
03-27-2025
|
04-24-2025
|
Katie Burkle
|
Open Document
|
6673
|
API 610, 13th Edition - Reballot
|
SOME - Subcommittee on Mechanical Equipment
|
03-26-2025
|
04-30-2025
|
Katie Burkle
|
Open Document
|
6672
|
TG OCTG - WI 2452 - 5CT Review Section 13 Definition of Manufacturer
|
SC05/TG1: Task Group on OCTG Casing & Tubing
|
03-26-2025
|
04-23-2025
|
Mario Diaz
|
Open Document
|
6671
|
API 583, 3rd Edition - Reballot
|
SCIMI Subcommittee
|
03-26-2025
|
04-30-2025
|
Katie Burkle
|
Open Document
|
6670
|
API 520, Pt1, 11th Edition - Effective Kd For Two-phase Flow - Reballot
|
SCPRS - Subcommittee on Pressure-Relieving Systems
|
03-26-2025
|
04-30-2025
|
Katie Burkle
|
Open Document
|
6669
|
Reaffirmation for API STD 20H: Heat Treatment Services - Batch Type for Equipment Used in the Petroleum and Natural Gas Industry, 2nd Edition
|
SC20/V20H: Spec 20H Task Group, Heat Treatment - Batch Type
|
03-25-2025
|
05-05-2025
|
Sergio Gomez
|
|
6668
|
API 521, Xth Edition - Work Item 28 - Liquid Displacement Piping Considerations
|
SCPRS - Subcommittee on Pressure-Relieving Systems
|
03-25-2025
|
04-29-2025
|
Katie Burkle
|
Open Document
|
6667
|
API 520, Pt1, 11th Edition - Definition of Trim
|
SCPRS - Subcommittee on Pressure-Relieving Systems
|
03-25-2025
|
04-22-2025
|
Katie Burkle
|
Open Document
|
6666
|
API 520, Pt1, 11th Edition - Test Gags - Reballot
|
SCPRS - Subcommittee on Pressure-Relieving Systems
|
03-25-2025
|
04-22-2025
|
Katie Burkle
|
Open Document
|
6665
|
API 520, Pt1, 11th Edition - Hot liquid and uses for lifting levers - Reballot
|
SCPRS - Subcommittee on Pressure-Relieving Systems
|
03-25-2025
|
04-22-2025
|
Katie Burkle
|
Open Document
|
6664
|
API 619, 6th Edition
|
SOME - Subcommittee on Mechanical Equipment
|
03-24-2025
|
04-28-2025
|
Katie Burkle
|
Open Document
|
6663
|
API MPMS Ch 14.5 Calculation of Gross Heating Value, Specific Gravity and Compressibility of Natural Gas Mixture from Compositional Analysis, Third Edition Reaffirmation Ballot
|
COGFM: Committee on Gas Fluids Measurement
|
03-24-2025
|
05-05-2025
|
Lanaya Bankins
|
|
6662
|
API MPMS Ch 22.6 Testing Protocol for Gas Chromatographs, First Edition Reaffirmation Ballot
|
COGFM: Committee on Gas Fluids Measurement
|
03-24-2025
|
05-05-2025
|
Lanaya Bankins
|
|
6661
|
SCOPV RP 591 - 7th Edition approval (full re-ballot)
|
SCOPV - Subcommittee on Piping and Valves
|
03-18-2025
|
04-23-2025
|
Nicholas Montebello
|
Open Document
|
6658
|
API 19SS Sand Screens 1st Edition
|
SC19: 19SS: Sand Screen Equipment
|
03-18-2025
|
04-28-2025
|
Elton Patram
|
|
6652
|
API Standard 6FA Fire Test for Valves 6 Edition Ballot
|
SC06CombinationVG
|
03-13-2025
|
04-24-2025
|
Jose Godoy
|
Open Document
|
6650
|
API Recommended Practice 556-5, 1st edition
|
SOICS - Subcommittee on Instruments & Controls Systems
|
03-11-2025
|
04-29-2025
|
Dane Asuigui
|
Open Document
|
6648
|
Reaffirmation for API SPEC 20B: Open Die Shaped Forgings for use in the Petroleum and Natural Gas Industry, 2nd Edition
|
SC20/V20B: Spec 20B Task Group, Open-die Forgings
|
03-10-2025
|
04-28-2025
|
Sergio Gomez
|
|
6641
|
API STD 20M: Qualification of Suppliers of Machining Services for Use in the Petroleum and Natural Gas Industries, 2nd Edition
|
SC20/V20M: Std 20M Task Group, Machining Services
|
03-05-2025
|
04-21-2025
|
Sergio Gomez
|
Open Document
|
6639
|
Reaffirmation for API STD 20G: Welding Services for Equipment used in the Petroleum and Natural Gas Industry, 1st Edition
|
SC20/V20G: Std 20G Task Group, Welding
|
03-05-2025
|
04-23-2025
|
Sergio Gomez
|
|
6623
|
Ballot for RP 79-3 First Edition Tripping Operations with Surface Back-Pressure Managed Pressure Drilling with Subsea BOP
|
DPOS: RP 79 TG - Tripping Drill Pipe
|
02-19-2025
|
04-21-2025
|
Jose Godoy
|
Open Document
|
6622
|
BALLOT for RP-79-2 First Edition Tripping Operations with Surface Back-pressure Managed Pressure Drilling with Surface BOP
|
DPOS: RP 79 TG - Tripping Drill Pipe
|
02-19-2025
|
04-21-2025
|
Jose Godoy
|
Open Document
|