Skip to main content

Open Ballots


BallotId Ballot Committees StartDate Close Date Associate Document
7091 Reaffirmation Ballot for 10B-6, e1 SC10: Well Cements 07-10-2026 08-21-2026 Diana Escudero
7090 OQWG - RP 1161: WG3 Bibliography 7th Ed. Revisions RP 1161 Operator Qualification Work Group 07-09-2026 08-20-2026 Nicholas Montebello Open Document
7089 OQWG - RP 1161: WG3 Annex F 7th Ed. Revisions RP 1161 Operator Qualification Work Group 07-09-2026 08-20-2026 Nicholas Montebello Open Document
7088 OQWG - RP 1161: WG3 Annex E 7th Ed. Revisions RP 1161 Operator Qualification Work Group 07-09-2026 08-20-2026 Nicholas Montebello Open Document
7087 OQWG - RP 1161: WG3 Front Matter 7th Ed. Revisions RP 1161 Operator Qualification Work Group 07-09-2026 08-20-2026 Nicholas Montebello Open Document
7086 Withdrawal of API RP 1639, 1st Edition — Owner/Operator’s Guide to Operation and Maintenance of Vapor Recovery Systems at Gasoline Dispensing Facilities Retail Marketing Standards Committee 07-09-2026 08-14-2026 Sergio Gomez
7084 API 2201 - Safe Hot Tapping Practices in the Petroleum and Petrochemical Industries - 6th Edition SFPG - 2201 and 1104 Joint TG 07-07-2026 08-24-2026 Sergio Gomez Open Document
7083 API Specification 19LH Liner Hanger Equipment - 2nd Edition - Revision SC19: 19LH Liner Hangers 07-01-2026 08-14-2026 Elton Patram Open Document
7082 WG Ballot for MPMS Ch. 3.1A Standard Practice for the Manual Gauging of Petroleum and Petroleum Products COLM Ch. 3.1A WG on Manual Gauging 06-30-2026 07-30-2026 Patty Fusaro Open Document
7081 API Technical Report TDB-5, 1st Edition TDC - Technical Data Committee 06-30-2026 08-13-2026 Ivan Pinto Open Document
7080 API 14B Recommended Practice - 6th Edition - REAFFIRMATION SC19: 14A&14B Task Group - Subsurface Flow Control Equipment 06-24-2026 07-24-2026 Elton Patram
7079 API 19CI Chemical Injection Devices and Related Equipment -1st Edition- Reaffirmation SC19: 19CI Chemical Injection Devices 06-23-2026 07-24-2026 Elton Patram
7078 REAFFIRMATION: RP100-2 Environmental Aspects Associated with Exploration and Production Operations including Hydraulic Fracturing, 1st Ed. SC23: Leadership 06-16-2026 07-28-2026 Jose Godoy
7077 REAFFIRMATION: RP 100-1 Hydraulic Fracturing - Well Integrity and Fracture Containment, 1st Ed. SC23: Leadership 06-16-2026 07-28-2026 Jose Godoy
7076 API 16M, 1st Edition - Pressure Testing Validation SC16 Task Group 5 - S53,S64,RP59,16CBM,16G,16H, 16K, 16I, 16M 06-08-2026 07-27-2026 Sergio Gomez Open Document
7075 API 19PT Perforating Tools - Second Edition - Revision SC19: 19PT Perforating Tools 06-05-2026 07-20-2026 Elton Patram Open Document
7074 API MPMS Chapter 17.10.2 COMA Ch. 17.10.2 Measurement of Refrigerated and/or Pressurized Cargoes Part 2 07-04-2026 07-16-2026 Sarah Sowden
7072 API BALLOT for 6DSS 4th Edition SC06/V06D: Pipeline, Valves & Connectors 06-03-2026 07-15-2026 Iman Kohshour Open Document
7071 API RE-BALLOT for 6A 22nd Edition SC06/V06A: Wellhead & Christmas Tree Equipment 06-02-2026 07-14-2026 Iman Kohshour Open Document
7067 API 19OH - 2nd Edition - Revision - Openhole Isolation Equipment SC19: 19OH - Openhole Isolation Equipment 05-27-2026 07-17-2026 Elton Patram Open Document