|
7174
|
SCAST SGF 653-2078: Define Shell Penetrations
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-03-2026
|
10-15-2026
|
Dane Asuigui
|
Open Document
|
|
7173
|
SCAST SGF 653-2077: Alternate to VBT examination for "Welded-on Patch" in Bottom plate
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-03-2026
|
10-15-2026
|
Dane Asuigui
|
Open Document
|
|
7172
|
SCAST SGF 650-2085: API 650 Annex S, addition of UNS S31655
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-02-2026
|
10-14-2026
|
Dane Asuigui
|
Open Document
|
|
7171
|
SCAST SGF 650-2084: API 650 Annex X, addition of UNS S82441
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-02-2026
|
10-14-2026
|
Dane Asuigui
|
Open Document
|
|
7170
|
SCAST SGF 650-2083: RFI 10726 Annex F.4.4 Air Test
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-02-2026
|
10-14-2026
|
Dane Asuigui
|
Open Document
|
|
7169
|
SCAST SGF 650-2082: Testing Frequency of Heat Treated Plate
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-02-2026
|
10-14-2026
|
Dane Asuigui
|
Open Document
|
|
7168
|
SCAST SGF 650-2079: 3-plate lap spacing in relation to annular plate
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-02-2026
|
10-14-2026
|
Dane Asuigui
|
Open Document
|
|
7167
|
SCAST SGF 650-2078: Allowable Materials for Reduced PWHT Temperatures
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-02-2026
|
10-14-2026
|
Dane Asuigui
|
Open Document
|
|
7166
|
SCAST SGF 650-2077: Alternate to VBT examination for "Welded-on Patch" in Bottom plate
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-02-2026
|
10-14-2026
|
Dane Asuigui
|
Open Document
|
|
7165
|
SCAST SGF 620-2085: Annex S, addition of UNS S31655
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-01-2026
|
10-13-2026
|
Dane Asuigui
|
Open Document
|
|
7164
|
SCAST SGF 620-2084: Annex X, addition of UNS S82441
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-01-2026
|
10-13-2026
|
Dane Asuigui
|
Open Document
|
|
7163
|
SCAST SGF 620-2083: API 620 Permanent Attachments
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-01-2026
|
10-13-2026
|
Dane Asuigui
|
Open Document
|
|
7162
|
SCAST SGF 620-2078: PWHT Temperatures and Hold Times
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-01-2026
|
10-13-2026
|
Dane Asuigui
|
Open Document
|
|
7161
|
SCAST SGF 620-2070: Production Welding Procedures API 620 R 4.3 c)
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-01-2026
|
10-13-2026
|
Dane Asuigui
|
Open Document
|
|
7160
|
API Std 556-6
|
SOICS 556 - Consensus Body
|
08-26-2026
|
10-08-2026
|
Ivan Pinto
|
Open Document
|
|
7159
|
TG OCTG - WI 2451 – API 5C1_e19
|
SC05/TG1: Task Group on OCTG Casing & Tubing
|
08-25-2026
|
10-06-2026
|
Mario Diaz
|
Open Document
|
|
7158
|
Reaffirmation for API RP 7G, Recommended Practice for Drill Stem Design and Operating Limits, 16th Edition
|
SC05/TG3: Task Group on Drill Stem Elements
|
08-25-2026
|
10-06-2026
|
Mario Diaz
|
|
|
7157
|
TG DSE – WI 7078 – API 7V_e1, Addendum 2
|
SC05/TG3: Task Group on Drill Stem Elements
|
08-25-2026
|
10-06-2026
|
Mario Diaz
|
Open Document
|
|
7156
|
COLM Ch. 4.9.2, Determination of the Volume of Displacement and Tank Provers by the Waterdraw Method of Calibration. 2nd Ed.
|
COLM: Committee on Liquid Measurement
|
08-25-2026
|
10-06-2026
|
Patty Fusaro
|
Open Document
|
|
7155
|
API RP 970, 3rd Edition
|
SCCM - Subcommittee on Corrosion & Materials
|
08-24-2026
|
10-05-2026
|
Dane Asuigui
|
Open Document
|
|
7154
|
API 18LCM 1st Edition - WITHDRAWAL
|
SC18: Subcommittee on Quality
|
08-21-2026
|
10-02-2026
|
Elton Patram
|
|
|
7153
|
Reaffirmation of API 675, 3rd Edition
|
SOME - Subcommittee on Mechanical Equipment
|
08-20-2026
|
09-17-2026
|
Katie Burkle
|
|
|
7152
|
Reaffirmation ballot for RP 10B-4, e2
|
SC10: Well Cements
|
08-20-2026
|
09-21-2026
|
Diana Escudero
|
|
|
7151
|
Reaffirmation of API 681, 2nd Edition
|
SOME - Subcommittee on Mechanical Equipment
|
08-20-2026
|
09-17-2026
|
Katie Burkle
|
|
|
7150
|
Reaffirmation ballot RP 10B-3, e2
|
SC10: Well Cements
|
08-20-2026
|
09-21-2026
|
Diana Escudero
|
|
|
7149
|
Comment Only Ballot for 2T, e4
|
SC02: Offshore Structures
|
08-19-2026
|
09-30-2026
|
Diana Escudero
|
Open Document
|
|
7148
|
Reaffirmation Ballot for 2W, e6, w/addendum
|
SC02: Offshore Structures
|
08-19-2026
|
09-18-2026
|
Diana Escudero
|
|
|
7147
|
COLM Ch. 5.X Measurement of Conductive Liquids by Electromagnetic Meters
|
COLM: Committee on Liquid Measurement
|
08-18-2026
|
09-29-2026
|
Patty Fusaro
|
Open Document
|
|
7146
|
API 520, Pt I, 11th Edition
|
SCPRS - Subcommittee on Pressure-Relieving Systems
|
08-18-2026
|
09-29-2026
|
Katie Burkle
|
Open Document
|
|
7145
|
Reaffirmation Ballot for 10F, e4
|
SC10: Well Cements
|
08-18-2026
|
09-15-2026
|
Diana Escudero
|
|
|
7144
|
Reaffirmation ballot for API RP 17L2, 2nd Edition
|
SC17: Voting Flexible Pipe and Ancillary Equipment; SC17: Flexible Pipe;
|
08-18-2026
|
09-18-2026
|
Iman Kohshour
|
|
|
7143
|
Reaffirmation ballot for API SPEC 17L1, 2nd Edition
|
SC17: Voting Flexible Pipe and Ancillary Equipment; SC17: Flexible Pipe;
|
08-18-2026
|
09-18-2026
|
Iman Kohshour
|
|
|
7142
|
Reaffirmation ballot for API RP 7HU1, 1st Edition
|
SC08/TG05: Hammer Unions
|
08-18-2026
|
09-18-2026
|
Iman Kohshour
|
|
|
7141
|
Reaffirmation ballot for API RP 8B, 8th Edition
|
SC08/TG03: Hoisting Equipment
|
08-18-2026
|
09-18-2026
|
Iman Kohshour
|
|
|
7140
|
Reaffirmation ballot for API RP 4G, 5th Edition
|
SC08/TG01: Drilling Structures
|
08-18-2026
|
09-18-2026
|
Iman Kohshour
|
|
|
7139
|
COLM Ch. 2.3 Method for Measurement and Calibration of Spheres and Spheroids
|
COLM: Committee on Liquid Measurement
|
08-17-2026
|
09-28-2026
|
Patty Fusaro
|
Open Document
|
|
7136
|
API BALLOT for 17E 6th Edition
|
SC17: Voting Subsea Equipment (Except Flexibles)
|
08-07-2026
|
09-18-2026
|
Iman Kohshour
|
Open Document
|
|
7134
|
COLM RP 25XX Verification of Double Block-and-Bleed Valves in Hydrocarbon Measurement Applications, First Edition. REBALLOT
|
COLM: Committee on Liquid Measurement
|
08-04-2026
|
09-15-2026
|
Patty Fusaro
|
Open Document
|
|
7133
|
CPMA Ch. 20.XX, Full-Range Online Water Cut Analyzers, 1Ed.
|
CPMA: Committee on Production Measurement & Allocation
|
08-04-2026
|
09-15-2026
|
Patty Fusaro
|
Open Document
|
|
7129
|
API 576, 5th Edition, Addendum 2
|
SCIMI Subcommittee
|
07-30-2026
|
09-09-2026
|
Katie Burkle
|
Open Document
|
|
7128
|
API 607, 9th Edition - Fire Test for Quarter-turn Valves and Valves Equipped with Nonmetallic Seats
|
SCOPV - Subcommittee on Piping and Valves
|
07-30-2026
|
09-10-2026
|
Ivan Pinto
|
Open Document
|
|
7127
|
TG LP - WI 4265 - 5L Repair Welding
|
SC05/TG2: Task Group on Line Pipe
|
07-29-2026
|
09-23-2026
|
Mario Diaz
|
Open Document
|
|
7122
|
TG DSE – WI 7073 – DSC Additions to RP 7G-1
|
SC05/TG3: Task Group on Drill Stem Elements
|
07-28-2026
|
09-08-2026
|
Mario Diaz
|
Open Document
|
|
7119
|
API Technical Report TDB-9, 1st Edition
|
TDC - Technical Data Committee
|
07-23-2026
|
09-04-2026
|
Ivan Pinto
|
Open Document
|
|
7118
|
API 16WL - Cased Hole Wireline Pressure Control Equipment and Systems, 1st Edition
|
SC16 Task Group 2 - 16B, 16ST, 16WL, 16WS, 16SB
|
07-21-2026
|
09-18-2026
|
Sergio Gomez
|
Open Document
|