Skip to main content

Open Ballots


BallotId Ballot Committees StartDate Close Date Associate Document
7148 Reaffirmation Ballot for 2W, e6, w/addendum SC02: Offshore Structures 08-19-2026 09-18-2026 Diana Escudero
7147 COLM Ch. 5.X Measurement of Conductive Liquids by Electromagnetic Meters COLM: Committee on Liquid Measurement 08-18-2026 09-29-2026 Patty Fusaro Open Document
7146 API 520, Pt I, 11th Edition SCPRS - Subcommittee on Pressure-Relieving Systems 08-18-2026 09-29-2026 Katie Burkle Open Document
7145 Reaffirmation Ballot for 10F, e4 SC10: Well Cements 08-18-2026 09-15-2026 Diana Escudero
7144 Reaffirmation ballot for API RP 17L2, 2nd Edition SC17: Voting Flexible Pipe and Ancillary Equipment; SC17: Flexible Pipe; 08-18-2026 09-18-2026 Iman Kohshour
7143 Reaffirmation ballot for API SPEC 17L1, 2nd Edition SC17: Voting Flexible Pipe and Ancillary Equipment; SC17: Flexible Pipe; 08-18-2026 09-18-2026 Iman Kohshour
7142 Reaffirmation ballot for API RP 7HU1, 1st Edition SC08/TG05: Hammer Unions 08-18-2026 09-18-2026 Iman Kohshour
7141 Reaffirmation ballot for API RP 8B, 8th Edition SC08/TG03: Hoisting Equipment 08-18-2026 09-18-2026 Iman Kohshour
7140 Reaffirmation ballot for API RP 4G, 5th Edition SC08/TG01: Drilling Structures 08-18-2026 09-18-2026 Iman Kohshour
7139 COLM Ch. 2.3 Method for Measurement and Calibration of Spheres and Spheroids COLM: Committee on Liquid Measurement 08-17-2026 09-28-2026 Patty Fusaro Open Document
7136 API BALLOT for 17E 6th Edition SC17: Voting Subsea Equipment (Except Flexibles) 08-07-2026 09-18-2026 Iman Kohshour Open Document
7135 Reaffirmation Ballot for Std 19C, e2 SC13: Drilling Completion and Fracturing Fluids 08-05-2026 09-02-2026 Diana Escudero
7134 COLM RP 25XX Verification of Double Block-and-Bleed Valves in Hydrocarbon Measurement Applications, First Edition. REBALLOT COLM: Committee on Liquid Measurement 08-04-2026 09-15-2026 Patty Fusaro Open Document
7133 CPMA Ch. 20.XX, Full-Range Online Water Cut Analyzers, 1Ed. CPMA: Committee on Production Measurement & Allocation 08-04-2026 09-15-2026 Patty Fusaro Open Document
7132 API 520, Pt2, 8th Edition - Critical Line Length - REBALLOT SCPRS - Subcommittee on Pressure-Relieving Systems 08-03-2026 08-31-2026 Katie Burkle Open Document
7131 Reaffirmation of API 677, 4th Edition SOME - Subcommittee on Mechanical Equipment 07-31-2026 08-27-2026 Katie Burkle
7130 Reaffirmation of API 613, 6th Edition SOME - Subcommittee on Mechanical Equipment 07-31-2026 08-27-2026 Katie Burkle
7129 API 576, 5th Edition, Addendum 2 SCIMI Subcommittee 07-30-2026 09-09-2026 Katie Burkle Open Document
7128 API 607, 9th Edition - Fire Test for Quarter-turn Valves and Valves Equipped with Nonmetallic Seats SCOPV - Subcommittee on Piping and Valves 07-30-2026 09-10-2026 Ivan Pinto Open Document
7127 TG LP - WI 4265 - 5L Repair Welding SC05/TG2: Task Group on Line Pipe 07-29-2026 09-23-2026 Mario Diaz Open Document
7125 TG OCTG - WI 2481 - 5CT Q125 to SR43 Charpy Impact Requirements SC05/TG1: Task Group on OCTG Casing & Tubing 07-29-2026 08-26-2026 Mario Diaz Open Document
7124 TG OCTG - WI 2480 - 5CT Oblique Notch Angle Tolerance SC05/TG1: Task Group on OCTG Casing & Tubing 07-29-2026 08-26-2026 Mario Diaz Open Document
7122 TG DSE – WI 7073 – DSC Additions to RP 7G-1 SC05/TG3: Task Group on Drill Stem Elements 07-28-2026 09-08-2026 Mario Diaz Open Document
7120 API 522, 2nd Edition - COMMENT ONLY SCPRS - Subcommittee on Pressure-Relieving Systems 07-27-2026 08-26-2026 Katie Burkle Open Document
7119 API Technical Report TDB-9, 1st Edition TDC - Technical Data Committee 07-23-2026 09-04-2026 Ivan Pinto Open Document
7118 API 16WL - Cased Hole Wireline Pressure Control Equipment and Systems, 1st Edition SC16 Task Group 2 - 16B, 16ST, 16WL, 16WS, 16SB 07-21-2026 09-18-2026 Sergio Gomez Open Document
7117 WG ballot Chapter 10.4, e6 COMQ Ch. 10.4 WG 07-29-2026 08-31-2026 Kemi Allston Open Document
7115 Reaffirmation Ballot for 2N,e3 SC02: Offshore Structures 07-22-2026 09-02-2026 Diana Escudero
7114 Reaffirmation Ballot for 2MOP, e1 SC02: Offshore Structures 07-22-2026 09-02-2026 Diana Escudero
7113 Reaffirmation Ballot for 2MET, e2 SC02: Offshore Structures 07-22-2026 09-02-2026 Diana Escudero
7102 OQWG - RP 1161: WG4 7th Ed. Revisions: Task 2.4—Install Test Leads by Exothermic Welding Methods RP 1161 Operator Qualification Work Group 07-16-2026 08-19-2026 Nicholas Montebello Open Document
7091 Reaffirmation Ballot for 10B-6, e1 SC10: Well Cements 07-10-2026 08-21-2026 Diana Escudero
7090 OQWG - RP 1161: WG3 Bibliography 7th Ed. Revisions RP 1161 Operator Qualification Work Group 07-09-2026 08-20-2026 Nicholas Montebello Open Document
7089 OQWG - RP 1161: WG3 Annex F 7th Ed. Revisions RP 1161 Operator Qualification Work Group 07-09-2026 08-20-2026 Nicholas Montebello Open Document
7088 OQWG - RP 1161: WG3 Annex E 7th Ed. Revisions RP 1161 Operator Qualification Work Group 07-09-2026 08-20-2026 Nicholas Montebello Open Document
7087 OQWG - RP 1161: WG3 Front Matter 7th Ed. Revisions RP 1161 Operator Qualification Work Group 07-09-2026 08-20-2026 Nicholas Montebello Open Document
7084 API 2201 - Safe Hot Tapping Practices in the Petroleum and Petrochemical Industries - 6th Edition SFPG - 2201 and 1104 Joint TG 07-07-2026 08-24-2026 Sergio Gomez Open Document
7083 API Specification 19LH Liner Hanger Equipment - 2nd Edition - Revision SC19: 19LH Liner Hangers 07-01-2026 08-28-2026 Elton Patram Open Document
7078 REAFFIRMATION: RP100-2 Environmental Aspects Associated with Exploration and Production Operations including Hydraulic Fracturing, 1st Ed. SC23: Leadership 06-16-2026 08-21-2026 Jose Godoy
7077 REAFFIRMATION: RP 100-1 Hydraulic Fracturing - Well Integrity and Fracture Containment, 1st Ed. SC23: Leadership 06-16-2026 08-21-2026 Jose Godoy