6567
|
API RP 16FI - Frac Iron Guidelines and Requirements
|
SC16/TG08 16FI
|
11-20-2024
|
01-15-2025
|
Sergio Gomez
|
Open Document
|
6566
|
Reaffirmation of API MPMS Chapter 2.8B Establishment of the Location of the Reference Gauge Point and the Gauge Height of Tanks on Marine Tank Vessels
|
COLM: Committee on Liquid Measurement
|
11-18-2024
|
12-13-2024
|
Nicholas Monchak
|
|
6565
|
Reaffirmation of API MPMS Chapter 2.2G Calibration of Upright Cylindrical Tanks using the Total Station Reference Line Method
|
COLM: Committee on Liquid Measurement
|
11-18-2024
|
12-13-2024
|
Nicholas Monchak
|
|
6564
|
API Standard 6Y First Edition
|
SC06CombinationVG
|
11-15-2024
|
12-27-2024
|
Jose Godoy
|
Open Document
|
6563
|
API RP 9B, 14th Edition, Addendum 2
|
SC08/TG04: Wire Rope & Roller Chain
|
11-13-2024
|
12-11-2024
|
Grayson Ridgway
|
Open Document
|
6562
|
API RP 7L, 1st Edition – Reaffirmation
|
SC08/TG02: Drilling Equipment
|
11-13-2024
|
12-11-2024
|
Grayson Ridgway
|
|
6561
|
SR3 for RP 11MAOP Engineering Critical Assessment for confirming Maximum Allowable Operating Pressure for Natural Gas Pipelines
|
COPS: Committee on Pipeline Standards
|
11-13-2024
|
12-04-2024
|
Patty Fusaro
|
Open Document
|
6560
|
SR3 for RP 11ML , Assessment and Management of Pipeline Metal Loss
|
COPS: Committee on Pipeline Standards
|
11-13-2024
|
12-04-2024
|
Patty Fusaro
|
Open Document
|
6559
|
SR3 for RP 1186 Pipeline Safety Metrics
|
COPS: Committee on Pipeline Standards
|
11-13-2024
|
12-04-2024
|
Patty Fusaro
|
Open Document
|
6558
|
API Spec 9A, 27th Edition, Addendum 2
|
SC08/TG04: Wire Rope & Roller Chain
|
11-12-2024
|
12-10-2024
|
Grayson Ridgway
|
Open Document
|
6556
|
API Std 20D, Qualification of Nondestructive Examination Services for Equipment Used in the Petroleum and Natural Gas Industry, 3rd Edition
|
SC20/V20D: Spec 20D Task Group, NDE
|
11-11-2024
|
12-23-2024
|
Sergio Gomez
|
Open Document
|
6555
|
API Ballot: RP 1161, Operator Qualifications - Task Series 38
|
OQWG: Operator Qualification Work Group
|
11-05-2024
|
12-03-2024
|
John Buflod
|
|
6554
|
API Ballot: RP 1161, Operator Qualifications - Tasks 33 + 35
|
OQWG: Operator Qualification Work Group
|
11-05-2024
|
12-03-2024
|
John Buflod
|
Open Document
|
6553
|
Reaffirmation Ballot for RP 1181 e1
|
Pipeline Construction Voting Group
|
11-04-2024
|
12-02-2024
|
Diana Escudero
|
|
6552
|
Reaffirmation for RP 1115 e2
|
Pipeline Construction Voting Group
|
11-04-2024
|
12-02-2024
|
Diana Escudero
|
|
6551
|
API Std. 589 3rd Edition - Second Approval Ballot
|
SCOPV - Subcommittee on Piping and Valves
|
11-04-2024
|
12-17-2024
|
Nicholas Montebello
|
Open Document
|
6550
|
TG DSE – WI 7072 – API Spec 7V, Edition 1, Addendum 1
|
SC05/TG3: Task Group on Drill Stem Elements
|
11-04-2024
|
12-03-2024
|
Mario Diaz
|
Open Document
|
6549
|
API Ballot: RP 1161, Operator Qualifications - Annex C, Historical Tasks
|
OQWG: Operator Qualification Work Group
|
11-04-2024
|
12-02-2024
|
John Buflod
|
Open Document
|
6548
|
Reaffirmation - API 19OH Openhole Isolation Equipment - 1st Edition
|
SC19: 19OH - Openhole Isolation Equipment
|
11-01-2024
|
11-30-2024
|
Elton Patram
|
|
6547
|
API Ballot: MPMS Ch. 17.14.2 - Measurement of Bulk Cargoes by Draft Survey, Part 2: Inland Barges
|
COMA: Committee on Measurement Accountability; COMA Ch. 17.14 Measurement of Bulk Cargoes by Draft Survey;
|
11-01-2024
|
12-02-2024
|
John Buflod
|
|
6546
|
TG OCTG - WI 2470 - API Spec 5CRA, 3rd Edition / Identical Adoption ISO 13680:2024
|
SC05/TG1: Task Group on OCTG Casing & Tubing
|
10-30-2024
|
12-04-2024
|
Mario Diaz
|
Open Document
|
6545
|
API Std. 20N, 2nd Edition - Heat Treatment Services—Continuous Line for Equipment Used in the Petroleum and Natural Gas Industry
|
SC20/V20N: Spec 20N Task Group, Heat Treatment - Continuous
|
10-30-2024
|
12-11-2024
|
Sergio Gomez
|
Open Document
|
6544
|
API Std. 603 10th edition - second ballot
|
SCOPV - Subcommittee on Piping and Valves
|
10-30-2024
|
11-29-2024
|
Nicholas Montebello
|
Open Document
|
6543
|
Comment Only Ballot: API CO2 Well Equipment Considerations
|
SC16 CO2 Ad-hoc
|
10-28-2024
|
12-01-2024
|
Jacqueline Roueche
|
Open Document
|
6539
|
API BALLOT: MPMS Ch. 23.1, Reconciliation of Liquid Pipeline Quantities, 1st Ed. - REAFFIRMATION
|
COMA: Committee on Measurement Accountability
|
10-25-2024
|
11-22-2024
|
John Buflod
|
|
6535
|
Reballot of API 16A, 4th Edition - Addendum 3 - QTC
|
SC16 Task Group 1- 16A,16AR,16AS,16SP, 16CV
|
10-21-2024
|
11-22-2024
|
Sergio Gomez
|
Open Document
|
6534
|
TG DSE – API RP 7G, 16th Edition, Addendum 3
|
SC05/TG3: Task Group on Drill Stem Elements
|
10-21-2024
|
12-16-2024
|
Mario Diaz
|
Open Document
|
6530
|
TG OCTG - WI 2380 - API Spec 5CT, 11th Edition, Addendum 1
|
SC05/TG1: Task Group on OCTG Casing & Tubing
|
10-15-2024
|
12-10-2024
|
Mario Diaz
|
Open Document
|
6523
|
API 20L - Qualification of Polymeric Seal Manufacturers for Use in the Petroleum and Natural Gas Industries, 2nd Edition
|
SC20/V20L: Spec 20L Task Group, Non-Metallic Seal Suppliers
|
10-04-2024
|
11-27-2024
|
Sergio Gomez
|
Open Document
|
6512
|
SCAST SGD Agenda Item 650-1045: Seismic Overturning at the Base of Each Shell Course
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
09-30-2024
|
11-26-2024
|
Nicholas Montebello
|
Open Document
|