6037
|
API RP 1161, Operator Qualification, Annex B: Tasks 2.1, 2.3. 2.4, 3
|
OQWG: Operator Qualification Work Group
|
03-23-2023
|
04-24-2023
|
John Buflod
|
Open Document
|
6036
|
API RP 1161, Operator Qualification, Annex B: Tasks 1.1, 1.2, 1.3, 1.4, 1.5
|
OQWG: Operator Qualification Work Group
|
03-23-2023
|
04-24-2023
|
John Buflod
|
Open Document
|
6035
|
API 653-2054 Annex G: Qualification of Tank Bottom Examination Procedures and Personnel
|
SCIMI Subcommittee; SCAST - Subcommittee on Aboveground Storage Tanks;
|
03-23-2023
|
05-04-2023
|
Jordan Strickler
|
Open Document
|
6034
|
Ballot to move content from TR 934-G to API 934-J
|
SCCM - Subcommittee on Corrosion & Materials
|
03-22-2023
|
04-05-2023
|
Diana Escudero
|
Open Document
|
6033
|
Fourth Ballot for API 641 e2
|
SCOPV Joint
|
03-22-2023
|
04-19-2023
|
Diana Escudero
|
Open Document
|
6032
|
API 534 3rd edition - Heat Recovery Steam Generators for Combustion Turbine Exhaust Applications
|
SCHTE Heat Transfer Consensus Group - Fired Equipment
|
03-20-2023
|
05-01-2023
|
Jordan Strickler
|
Open Document
|
6031
|
SR3 Approval - API RP 1173, 2nd Ed. - Pipeline Safety Management Systems
|
COPS: Committee on Pipeline Standards
|
03-17-2023
|
03-31-2023
|
John Buflod
|
Open Document
|
6030
|
API 581 Table 2.D.3.3 REDLINE
|
SCIMI RP 581 Task Group; SCIMI Subcommittee;
|
03-17-2023
|
04-14-2023
|
Christopher Hughes
|
Open Document
|
6029
|
API 581 Part 5, Section 7 and Appendix 5.B REDLINE
|
SCIMI RP 581 Task Group; SCIMI Subcommittee;
|
03-17-2023
|
04-14-2023
|
Christopher Hughes
|
Open Document
|
6028
|
SR3 Approval - RP 1169, 3rd Ed. - Pipeline Construction Inspection
|
COPS: Committee on Pipeline Standards
|
03-17-2023
|
03-31-2023
|
John Buflod
|
Open Document
|
6027
|
SR3 Approval - RP 1102, 8th Ed. - Rail & Road Crossings,
|
COPS: Committee on Pipeline Standards
|
03-17-2023
|
03-31-2023
|
John Buflod
|
Open Document
|
6026
|
API Spec 16B, Coiled Tubing, Snubbing, and Wireline Well Intervention Equipment, 1st Edition
|
SC16 Task Group 2 - 16B, 16ST, 16WL, 16WS, 16SB
|
03-10-2023
|
04-21-2023
|
Jacqueline Roueche
|
Open Document
|
6025
|
REAFFIRMATION of API Standard 682 4th Ed
|
SOME: Subcommittee on Mechanical Equipment
|
03-10-2023
|
04-21-2023
|
Christopher Hughes
|
Open Document
|
6024
|
API RP 756 2nd Edition
|
Facility Siting Standards Task Group
|
03-10-2023
|
04-21-2023
|
Christopher Hughes
|
Open Document
|
6023
|
API RP 753 2nd Edition
|
Facility Siting Standards Task Group
|
03-10-2023
|
04-21-2023
|
Christopher Hughes
|
Open Document
|
6022
|
API RP 752 4th Edition
|
Facility Siting Standards Task Group
|
03-10-2023
|
04-21-2023
|
Christopher Hughes
|
Open Document
|
6021
|
RP 982, 1st Edition - Inspection and Assessment of Refractory Linings
|
SCRM - Subcommittee on Refractory Materials; SCHTE Heat Transfer Consensus Group - Fired Equipment; SCRM Consensus Group;
|
03-06-2023
|
04-17-2023
|
Jordan Strickler
|
Open Document
|
6020
|
API 570 Piping Inspection Code 5th Ed REDLINE
|
SCIMI Subcommittee
|
03-10-2023
|
04-21-2023
|
Christopher Hughes
|
Open Document
|
6018
|
Second Ballot for API TR 2510a e3
|
Safety and Fire Protection Group
|
03-02-2023
|
04-13-2023
|
Diana Escudero
|
Open Document
|
6016
|
API 686 3rd Ed
|
TF on Standard 686; SOME: Subcommittee on Mechanical Equipment;
|
02-23-2023
|
04-06-2023
|
Christopher Hughes
|
Open Document
|
6015
|
API 12D e13 Specification for Field-welded Tanks for Storage of Production Liquids- COMMENT ONLY
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-22-2023
|
04-05-2023
|
Jordan Strickler
|
Open Document
|
6014
|
API 653-1012 Overhaul of Differential Settlement Methods
|
SCIMI Subcommittee; SCAST - Subcommittee on Aboveground Storage Tanks;
|
02-22-2023
|
04-05-2023
|
Jordan Strickler
|
Open Document
|
6013
|
API 650-1115 Correcting References to ASCE 7 for Wind
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-22-2023
|
04-05-2023
|
Jordan Strickler
|
Open Document
|
6012
|
API 650-1112 Anchor Embedment Design
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-22-2023
|
04-05-2023
|
Jordan Strickler
|
Open Document
|
6011
|
API 650-1110 Wind Girder Walkway Open - B.min Clarification
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-22-2023
|
04-05-2023
|
Jordan Strickler
|
Open Document
|
6010
|
API 650-1097: API 620 Studded Outlet Allowance
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-22-2023
|
04-05-2023
|
Jordan Strickler
|
Open Document
|
6009
|
API 650-1102 Update Annex C and H Terminology to Align with CELE
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-22-2023
|
04-05-2023
|
Jordan Strickler
|
Open Document
|
6008
|
API 650-1094 Annex G Tanks - Wind Girders Designed as Open Roof Tanks
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-22-2023
|
04-05-2023
|
Jordan Strickler
|
Open Document
|
6007
|
API 650-1091 Update Fixed Roof Definitions
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-22-2023
|
04-05-2023
|
Jordan Strickler
|
Open Document
|
6006
|
API 650-1090 Steel Pan Updates
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-22-2023
|
04-05-2023
|
Jordan Strickler
|
Open Document
|
6005
|
API 625-1011 Remove 100V plus 40H Seismic Combination for Base Shear Check
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-21-2023
|
04-04-2023
|
Jordan Strickler
|
Open Document
|
6004
|
API 620-1029 Correcting References to ASCE 7 for Wind
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-21-2023
|
04-04-2023
|
Jordan Strickler
|
Open Document
|
6003
|
API 620-1027 Anchor Embedment Design
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-21-2023
|
04-04-2023
|
Jordan Strickler
|
Open Document
|
6002
|
First Ballot for RP 2201 6th edition
|
Safety and Fire Protection Group
|
02-21-2023
|
04-04-2023
|
Diana Escudero
|
Open Document
|
6001
|
API 620-1025 Rules for Compression-Ring Regions Exceeding 2 Inches Thickness
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-21-2023
|
04-04-2023
|
Jordan Strickler
|
Open Document
|
6000
|
API 620-1023 Stress Limits and Seismic Clarifications
|
SCAST - Subcommittee on Aboveground Storage Tanks
|
02-21-2023
|
04-04-2023
|
Jordan Strickler
|
Open Document
|
5999
|
API RP 576, Inspection of Pressure-Relieving Devices, 5th Ed, 2nd Ballot REDLINE ONLY
|
SCPRS Subcommittee; SCIMI Subcommittee;
|
02-21-2023
|
04-04-2023
|
Christopher Hughes
|
Open Document
|
5998
|
Addition of New Low Viscosity Grades into ILSAC GF-6B
|
Auto Oil Advisory Panel (Oil); Auto Oil Advisory Panel (Auto);
|
02-15-2023
|
03-31-2023
|
Dennis L Bachelder
|
Open Document
|